LMP and FTR Concepts
PN1
PN2
PN3
Gen 1
Gen 2
Gen 3
Load 3
$22
Bid
$27
Bid
$32
Bid
100 MW
80 MW
20 MW
0 MW
80 MW Rating
120 MW
Rating
LMP’s
PN1
$22
PN2
$27
PN3
$27
Marginal Charge
for Congestion (PN1- PN2) = ($27 - $22)*100 = $500
Average Cost of Congestion (PN1 - PN2) = ($27*20) – ($22*20) = $100
If Load 3 held an 80 MW
FTR from PN1 to PN2, it
would receive a payment
of ($27-$22)*80 or
$400.